Диссертация (1173027), страница 23
Текст из файла (страница 23)
Society of Petroleum Engineers. doi:10.2118/118737-MS.122. Johancsik C.A., Friesen D.B. Dawson R. (1984, June 1). Torque and Drag inDirectional Wells-Prediction and Measurement. Society of Petroleum Engineers.doi:10.2118/11380-PA.123. Johancsik C.A., Friesen D.B., Dawson R. (1984, June 1). Torque and Drag inDirectional Wells-Prediction and Measurement. Society of Petroleum Engineers.doi:10.2118/11380-PA.124. Knight M.J., Brennan F.P. Fatigue life improvement of drill collars throughcontrol of bore eccentricity, In Engineering Failure Analysis, Volume 6, Issue 5,1999, р. 301-319.125.
Kyllingstad A., Halsey G.W. (1987, January 1). A Study of Slip-Stick Motion ofthe Bit. Society of Petroleum Engineers. doi:10.2118/16659-MS.126. Lubinsky A. Dinamic Loading of Drill Pipe During Tripping. Journal ofPetroleum Technology, August, 1988.154127. Matsuishi M., Endo T. (1968) Fatigue of metals subjected to varying stress, JapanSoc. Mech. Engineering.128. Mitchell R.F., Allen M.B. 1987. Case Studies of BHA Vibration Failure.Presented at SPE Annual Technical Conference and Exhibition, Dallas, Texas,USA, 27-30 September. http://dx.doi.org/10.2118/16675-MS.129. Naseri Y., Kulchitskiy V., Khormali A., Ajgunian V., Borozdin S.
(2015, October26). Deviation from Planned Well Path through Accumulated Cutting Bed inHigh-Angle and Horizontal Wells – a Case Study in one Western-SiberianOilfield. Society of Petroleum Engineers. doi:10.2118/176557-MS.130. Naseri Y., Tabatabaee Moradi, Nikolaev N.I. (2015, October 26). DevelopingHigh Resistant Cement Systems for High-pressure, HightemperatureApplications. Society of Petroleum Engineers. doi:10.2118/176523-MS.131. Naseri Yasin, Abiev A., Ruzieva A. Simulation and comparison of two kinds ofhydraulic motor's overflow valves and analysis of their failure strength.
AbstractBook. The Seventh International Youth Scientific and Practical Congress, Oil andGas Horizons, 24-26 November 2015.132. Noble W.B., Gillert G.I., Marsshell S.G. К вопросу о величине момента,требуемого для свинчивания замковых соединений разных размеров −Drilling 56 VIII, 17, №9.133. Olivier V., Averbuch D.C., Tollet S., lefevre B., Dupuis D.C. (2007, January 1).A New Drillstring Fatigue Supervision System. Society of Petroleum Engineers.doi:10.2118/105842-MS.134.
Ralph I. Stephens, Ali Fatemi, Robert R. S., Henry O.F. Metal Fatigue inEnginering. A Wiley-Interscience publication 2nd edition, J. Wiley & Sons, 2000.135. Rewcastle S.C., Burgess T.M. (1992, January 1). Real-Time Downhole ShockMeasurements Increase Drilling Efficiency and Improve MWD Reliability.Society of Petroleum Engineers.
doi:10.2118/23890-MS.136. Richard T., Detournay E. (2000, January 1). Stick-Slip Vibrations of PDC Bits.American Rock Mechanics Association.137. Samuel G.R. (2010) Basic Calculations, in Formulas and Calculations for DrillingOperations. John Wiley&Sons, Inc., Hoboken N.J., USA. doi: 10.1002/9781118010235. ch 1 doi: 10.1002/ 9781118010235. ch 6.138.
Shahani A.R., Sharifi S.M. Contact stress analysis and calculation of stressconcentration factors at the tool joint of a drill pipe, In Materials Design, Volume30, Issue 9, 2009, Pages 3615-3621, ISSN 0261-3069.139. Spanos, P.D., Payne M.L. (1992, January 1). Advances in Dynamic BottomholeAssembly Modeling and Dynamic Response Determination. Society of PetroleumEngineers. doi:10.2118/23905-MS.155140. Tang W., Muradov A., Chandler B., Jellison M.J., Gonzalez M.E., Wu J. (2006,January 1). A Novel Approach for Determining, Evaluating, and Applying StressConcentration Factor for Rotary Shouldered Connections. Society of PetroleumEngineers. doi:10.2118/103052-MS.141.
Trahman L.E. Methods for improvement of drill collar joints evaluated by fullsize fatique test. Petrolium Engineer, 1953, v. 25, № 2.142. Tsukano Y., Nishi S., Nishida S., Ueno M. (1989, January 1). Last-EngagedThread-Height Reduction of Pin Increases Fatigue Life of Drill Collar. Society ofPetroleum Engineers. doi:10.2118/18704-MS.143. Warren T.M., Oster J.H. 1998.
Torsional Resonance of Drill Collars with PDCBits in Hard Rock. Presented at SPE Annual Technical Conference andExhibition, New Orleans, Louisiana, USA, 27-30 September. SPE-49204-MS.http://dx.doi.org/10.2118/49204-MS.144. Warren T.M., Sinor A. 1986. Bit Performance Modeling.
Presented at SPEAnnual Technical Conference and Exhibition, New Orleans, Louisiana, 5-8October. SPE-15618-MS. http://dx.doi.org/10.2118/15618-MS.145. Zhu B., Steen T., Patterson Jr., Thomas W., Balaji M.A. (2013, September 3).Low Cycle Fatigue Analysis of Threaded Connectors for Subsea Drilling andProduction.
Society of Petroleum Engineers. doi:10.2118/166554-MS.146. www.rhino-3d.ru147. www.ansys.com/156Приложение 1 ─ Протокол НТС о повышении качества геологотехнологических исследований при бурении на РУО горизонтальныхскважин с МГРП по оптимизированному дизайну от 10.04.18157158Приложение 2 ─ Протокол НТС о повышении эффективности управлениясервисными подрядными предприятиями при бурении на РУОгоризонтальных скважин с МГРП по оптимизированному дизайну от11.09.2018159160161Приложение 3 ─ Протокол совещания ООО «Газпромнефть НТЦ» и АО«НИПЦ ГНТ» по развитию высокотехнологичных сегментов строительстваскважин и ВСР в ПАО «Газпром нефть» от 24.09.2018162163164165166Приложение 4 ─ Заключения технической экспертизы167168169Приложение 5 ─ Первичный акт об инциденте на скв.№50Г Приразломногоместорождения от 24.03.2017г..